Ximen Commercial City
Project Description:
The delicate building façade was well represented by using high-quality residential model making materials with excellent technologies and craftsmanship to mimic the details and texture of the actual design.
This residential building model took a total of 30 days to complete and the final products were proved to be a real success as it showcases not only the residential buildings but also the general picture of the whole complex.
